| Cooling circulating water | ≤20℃ ≥0.3Mpa 26~30 m3/h |
|---|---|
| Kelembaban | 85% tanpa kondensasi |
| Udara terkompresi | 6 m3/menit > 0,5MPa |
| Penggunaan Pipa | PU Pra-Isolasi |
| Total length | about 110m |
| Pemisah Tembakan/Pasir | 100T |
|---|---|
| Kolektor Debu Siklon | 1m |
| Pengumpul debu kartrid filter pulsa | Silinder |
| Jalur konveyor spiral | 32 Kartrid penyaring |
| Lift tembakan baja/pasir | 100T |
| Gunakan bahan | Busa PU, PE dan Pipa Dalam Plastik |
|---|---|
| Ketebalan busa | Pra-isolasi |
| Pipe Dia. | 20-50mm |
| Tempat | Di dalam ruangan |
| Suhu | 0-35 ℃ |
| Production Range | Pipe Diameter 110-600mm |
|---|---|
| Diameter Range | 110-2000mm |
| Dimension | 26*2.5*3m |
| Product-use | water supply pipe |
| Power | No-danger zone |
| Kondisi | Baru |
|---|---|
| Bahan Pipa | baja |
| Bahan | PE/PUR |
| Metode Pemanasan | Pemanas listrik |
| Bahan berbusa | Poliuretan |
| Aplikasi | Membuat pipa distribusi panas daerah |
|---|---|
| Pipe Structure | Steel Working Pipe-Polyurethane Foam-HDPE Casing |
| Udara terkompresi | 6 m3/menit > 0,5MPa |
| Penggunaan Pipa | PU Pra-Isolasi |
| Total Panjang | sekitar 110m |
| Kelembaban | 85% tanpa kondensasi |
|---|---|
| Bahan isolasi | busa poliuretan |
| Sistem kontrol | PLC |
| Metode Pendinginan | Pendingin air |
| Kekuatan | 3 fase 380V (-10%, +5%) 50Hz |
| Kapasitas Produksi | Dapat disesuaikan |
|---|---|
| Sistem kontrol | PLC |
| Bahan isolasi | busa poliuretan |
| Jenis | Mesin Pembuat Pipa |
| Kisaran Diameter Pipa | Dapat disesuaikan |
| Total Length | About 110m |
|---|---|
| Coating | Spray Winding |
| Medium Temperature | ≤120°C (incidental Peak Value <140°C) |
| Turkkey Project | Provided |
| Operating System | Touch Screen |
| Rentang Aplikasi | Pipeline produksi |
|---|---|
| Bahan | pe |
| Keuntungan | ekonomi bahan |
| Waktu pengiriman | 10Hari kerja |
| Syarat-syarat pembayaran | L/C, D/P, T/T, Western Union, MoneyGram |