| Bahan Lapisan Isolasi | PU berbusa |
|---|---|
| Sistem pengumpan | Pengumpan vakum |
| Sistem kontrol | Kontrol PLC |
| Jenis Produk | Lini produksi pipa |
| Gunakan bahan | Busa PU, PE dan Pipa Dalam Plastik |
| Automation | Automatic |
|---|---|
| Control System | PLC Control |
| Warranty | 12 Months |
| Pipe Type | PE Pipe |
| Application | Municipal drainage of water less than 45ºC, building outdoor drainage, buried farmland drainage, industrial sewage, road drainage, sewage disposal work, sport field square drainage, electrical and telecommunication project etc. |
| Paket Pengangkutan | Paket standar |
|---|---|
| Spesifikasi | 110-2200mm |
| Sekrup No. | Sekrup tunggal |
| Kemasan rincian | kemasan standar |
| Waktu pengiriman | 90 hari |
| Kondisi | Baru |
|---|---|
| Warna | Adat |
| Diameter pipa | 110-1680mm |
| Tenaga kerja | 2-3PERSON |
| Baut | Sekrup tunggal |
| Model | PE-850/1372 |
|---|---|
| ekstruder utama | SJ-120/33 |
| Diameter Pipa (mm) | Φ850-1372 |
| Kapasitas (KG/JAM) | 700-900 |
| Daya terpasang (kw) | 440KW |
| Spesifikasi | PE-960 |
|---|---|
| ekstruder utama | 150 |
| Diameter Pipa (mm) | 960 |
| Kapasitas (KG/JAM) | 800kg/jam |
| Kemasan rincian | Sesuai dengan Kondisi Nyata |
| Jenis Produk | Garis Ekstrusi Lembar / Papan |
|---|---|
| Total Daya | 100 kW-200 kW |
| Bahan baku | PE PP |
| Jenis ekstruder | Ekstruder Sekrup Tunggal |
| Sistem kontrol | Kontrol PLC |
| Application | Produce District Heat Distribution Pipe |
|---|---|
| Struktur Pipa | Pipa Pengolahan Baja-Polyurethane Foam-HDPE Casing |
| Loading Way | Vacuum Automatic Feeding |
| Penggunaan Pipa | PU Pra-Isolasi |
| Derusting beban ke pipa rak | 20 # saluran baja baris ganda |
| Spesifikasi | PE-990 |
|---|---|
| ekstruder utama | 170 |
| Diameter Pipa (mm) | 1060mm |
| Kapasitas (KG/JAM) | 800-1200 |
| Kemasan rincian | Sesuai dengan Kondisi Nyata |
| Warna | Dapat disesuaikan |
|---|---|
| Kata kunci | Mesin pembuat pipa bergelombang datar PE |
| Metode Pemanasan | Pemanas listrik |
| Kapasitas Produksi | 100-1000kg / jam |
| Metode Pendinginan | PENDINGIN AIR |