Semprot lini produksi pipa lilitan, proses semprot dan lilitan yang ditetapkan oleh Walstar pertama kali dilakukan

Jalur Produksi Pipa Isolasi Polyetilen Semprot
April 02, 2024
Brief: Discover the advanced Hot Chiller Water/Oil/Chemical Material Pipeline Pipe Foam Spray Insulated Machinery by Huashida. This innovative production line features polyurethane spraying and polyethylene winding, ensuring high efficiency, durability, and environmental benefits. Perfect for industrial applications requiring reliable insulation.
Related Product Features:
  • Independently developed by Huashida with multiple national patents.
  • Features continuous or intermittent spraying for versatile production.
  • High automation level ensures fast and efficient manufacturing.
  • Reduces raw material waste with improved foaming closed-cell rate.
  • Trinity molding enhances performance and reliability.
  • Low carbon footprint with significant economic and social benefits.
  • Suitable for steel pipes ranging from 206mm to 1820mm.
  • Comes with comprehensive technical support and maintenance services.
Pertanyaan:
  • What certifications does the Huashida Polyurethane Spraying Foam Preinsulated Steel Pipe Making Machine have?
    The machine is certified with CE and ISO9001:2008, ensuring high-quality standards.
  • What is the delivery time for this machinery?
    The delivery time is approximately 2 months, with secure packaging in wooden boxes.
  • What payment methods are accepted for purchasing this equipment?
    Accepted payment methods include L/C, T/T, DP, Western Union, and Paypal for convenience.
Video terkait

Lini Produksi Polyurethane Spray dan Polyethylene Wrapping Insulated Pipe

Jalur Produksi Pipa Isolasi Polyetilen Semprot
December 11, 2024

Spray Polyethylene penggulung mesin pipa isolasi

Jalur Produksi Pipa Isolasi Polyetilen Semprot
June 06, 2024

Spray Polyethylene penggulung mesin pipa isolasi

Jalur Produksi Pipa Isolasi Polyetilen Semprot
June 06, 2024

3 lpe

3pe
June 07, 2024

Mesin lini produksi jaket PE pra-insulasi

Saluran pipa pra terisolasi
December 11, 2024

Lengan Panas Menyusut

Lengan Panas Menyusut
March 15, 2024

Saluran Ekstrusi Pipa pE Pra-Insulated 150KW

Saluran pipa pra terisolasi
April 25, 2024