Dinding ganda

pipa bergelombang dinding ganda
April 01, 2025
Category Connection: Garis produksi pipa bergelombang
Brief: Discover the advanced Double Wall Corrugated Pipe Production Line for Dn ID600-1200mm pipes, featuring CE certification. This high-speed water-cooled production line uses HDPE/PP materials to create durable, lightweight pipes ideal for urban drainage, agricultural irrigation, and more.
Related Product Features:
  • Produces single and double wall corrugated pipes with light weight and high impact resistance.
  • Uses polypropylene (PP) or high-density polyethylene (HDPE) for superior corrosion and temperature resistance.
  • Closed water-cooled structure ensures smooth operation and long service life.
  • Automated production line with vacuum calibration, haul-off, cutter, and rewinder for efficiency.
  • Suitable for urban drainage, construction, and agricultural irrigation applications.
  • Features a unique circulating water circuit for reliable cooling and high-quality pipe surfaces.
  • Certified with CE and ISO9001:2008, meeting international standards.
  • Versatile for residential, commercial, and industrial drainage solutions.
Pertanyaan:
  • What materials are used in the Double Wall Corrugated Pipe Production Line?
    The production line primarily uses polypropylene (PP) or high-density polyethylene (HDPE) as raw materials for manufacturing durable pipes.
  • What are the key advantages of the pipes produced by this line?
    The pipes are lightweight, impact-resistant, corrosion-resistant, and suitable for both cold and heat applications, making them ideal for diverse environments.
  • What certifications does this production line have?
    The production line is CE certified and complies with ISO9001:2008 standards, ensuring high-quality and reliable performance.
Video terkait

Lini produksi pipa bergelombang DWCP

pipa bergelombang dinding ganda
July 24, 2025

mesin pipa dinding ganda

pipa bergelombang dinding ganda
April 28, 2025

3 lpe

3pe
June 07, 2024

Mesin lini produksi jaket PE pra-insulasi

Saluran pipa pra terisolasi
December 11, 2024

Lengan Panas Menyusut

Lengan Panas Menyusut
March 15, 2024

Saluran Ekstrusi Pipa pE Pra-Insulated 150KW

Saluran pipa pra terisolasi
April 25, 2024

Baris produksi tabung/lempeng isolasi busa karet

Barisan Produksi Tabung Isolasi busa karet
January 04, 2024